Skip to content

i09-2 energy  #1663

@Relm-Arrowny

Description

@Relm-Arrowny

Goals

Acceptance criteria :

  • To be able to control pgm and apple2 devices via set.
  • To be able to read and set polarisation.
  • To perform energy scan with both pgm and insertion devices.
  • A set of dodal devices are needed that acheve the goal.

Tasks

base on the goals, deduce the tasks required. check them off once they're done

  • Create apple2 device.
  • Create an energy to motor (ETM) position function.
  • Use the apple2 and the ETM function to make a apple2 controller that control energy and polarisation.
  • Using the controller to make a id energy and polarisation device.
  • Combine the id energy and PGM to from beam energy device to control the beamline energy.
  • Add all these device to beamline config.

Metadata

Metadata

Assignees

Labels

No labels
No labels

Type

No type

Projects

No projects

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions