Skip to content

CI

CI #4026

Triggered via schedule January 13, 2026 18:12
Status Failure
Total duration 9m 30s
Artifacts

ci.yaml

on: schedule
Matrix: build
CI
CI
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Java 21 / ubuntu
Process completed with exit code 1.
Java 17 / windows
The strategy configuration was canceled because "build.ubuntu_21" failed
Java 17 / windows
The operation was canceled.
Java 17 / ubuntu
The strategy configuration was canceled because "build.ubuntu_21" failed
Java 25 / ubuntu
The strategy configuration was canceled because "build.ubuntu_21" failed
Java 17 / ubuntu
The operation was canceled.
Java 25 / ubuntu
The operation was canceled.
Java 17 / macos
The strategy configuration was canceled because "build.ubuntu_21" failed
Java 17 / macos
The operation was canceled.