-
Notifications
You must be signed in to change notification settings - Fork 516
Closed
Description
The meeting will take place on Monday 2021/04/26 at 8pm UTC on IRC #lightning-dev. It is open to the public.
Pull Request Review
- Clarify Bolt 3 test vectors Clarify Bolt 3 htlc tx output test vectors #852
- Funding timeout recovery Funding Timeout Recovery proposal #854 / proposal: Added Funding Timeout Recovery proposal (KEYOLO variant) #866
- Deterministic points Deterministic points #862
-
Splicing Splice draft (feature 62/63) #863
Issues
Long Term Updates
-
Dual funding interactive-tx: Add dual-funding flow, using the interactive tx protocol (feature 28/29) #851 -
Trampoline routing Trampoline Routing (2021 edition) (Feature 56/57) #829 and Trampoline onion format (Feature 56/57) #836 (@t-bast) -
Offers Offers #798 (@rustyrussell) -
Upfront payments / DoS protection Hold fees #843 -
Blinded paths Route Blinding (Feature 24/25) #765 (@t-bast)
Backlog
The following are topics that we should discuss at some point, so if we have time to discuss them great, otherwise they slip to the next meeting.
-
Hornet (@cfromknecht) -
lnprototest https://github.com/rustyrussell/lnprototest (@rustyrussell)
vincenzopalazzo
Metadata
Metadata
Assignees
Labels
No labels