Skip to content

Specific TimeFrame option #474

@inbal2001

Description

@inbal2001

Hi,
Right now, when using krr, the only option regarding time frames is to run the krr from now to X time back.
I want to be able to run the krr on a specific time frame like regular metrics, for instance, run the krr from 05/09/2025 at 10:00 to 08/09/2025 at 10:00.

The reason I want to look at a specific time frame and not just go X time back is that some of my peaks were from a long time ago but they're still relevant and if I'll look till then, my krr and grafana will crash.

I was thinking that in the command you'll have an option to provide the start_time and end_time that will determine the time frame for the krr to run.

Please let me know if this is possible

Thanks :)

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions