Skip to content

chore(deps): update npm to v11 #5194

chore(deps): update npm to v11

chore(deps): update npm to v11 #5194

Triggered via push September 20, 2025 00:43
Status Failure
Total duration 26s
Artifacts

test.yml

on: push
Matrix: test_matrix
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test_matrix (20, ubuntu-latest)
Process completed with exit code 1.
test_matrix (20.8.1, ubuntu-latest)
The operation was canceled.
test_matrix (20.8.1, ubuntu-latest)
The strategy configuration was canceled because "test_matrix._20_ubuntu-latest" failed
test_matrix (21, ubuntu-latest)
The operation was canceled.
test_matrix (21, ubuntu-latest)
The strategy configuration was canceled because "test_matrix._20_ubuntu-latest" failed
test_dev
Process completed with exit code 1.
test
Process completed with exit code 1.