feat: first-class mcp support & a2a #1218
pull-request.yml
on: pull_request
Commitlint
14s
PostgreSQL Integration Tests
30s
Check TSDoc Links
14s
Matrix: build
Matrix: lint
Matrix: test-packages
Annotations
21 errors
Test internal
Process completed with exit code 1.
|
Test logger
Process completed with exit code 1.
|
Test server-core
Process completed with exit code 1.
|
Test docs-mcp
Process completed with exit code 1.
|
Build (Node 24)
Process completed with exit code 1.
|
Build (Node 22)
Process completed with exit code 1.
|
Build (Node 22)
The strategy configuration was canceled because "build._24" failed
|
Lint (Node 20)
Process completed with exit code 1.
|
Test cli
Process completed with exit code 1.
|
Lint (Node 22)
Process completed with exit code 1.
|
Lint (Node 22)
The strategy configuration was canceled because "lint._20" failed
|
Test supabase
Process completed with exit code 1.
|
Build (Node 20)
The operation was canceled.
|
Build (Node 20)
The strategy configuration was canceled because "build._24" failed
|
Test voice
Process completed with exit code 1.
|
Test create-voltagent-app
Process completed with exit code 1.
|
Test core
Process completed with exit code 1.
|
Lint (Node 24)
The operation was canceled.
|
Lint (Node 24)
The strategy configuration was canceled because "lint._20" failed
|
Test postgres
Process completed with exit code 1.
|
Test libsql
Process completed with exit code 1.
|