Skip to content

Add hotstack CI Job - sno-2-bm#686

Open
hjensas wants to merge 1 commit intoopenstack-k8s-operators:mainfrom
hjensas:ci-hotstack-job
Open

Add hotstack CI Job - sno-2-bm#686
hjensas wants to merge 1 commit intoopenstack-k8s-operators:mainfrom
hjensas:ci-hotstack-job

Conversation

@hjensas
Copy link
Copy Markdown
Contributor

@hjensas hjensas commented Mar 7, 2026

Single Node OpenShift (SNO), Sushy Emulator

2x Ironic Nodes

  • ironic0: redfish-virtual-media
  • ironic1: redfish

Assisted-By: Claude (claude-4.5-sonnet)

Describe your changes

Jira Ticket Link

Jira:

Checklist before requesting a review

  • I have performed a self-review of my code and confirmed it passes tests
  • Performed pre-commit run --all
  • Tested operator image in a test/dev environment. It can be CRC via install_yamls or a hotstack instance (optional)
  • Verified that no failures present in logs(optional):
    • ironic-operator-build-deploy-kuttl
    • podified-multinode-ironic-deployment

@openshift-ci openshift-ci bot requested review from abays and juliakreger March 7, 2026 23:42
@openshift-ci
Copy link
Copy Markdown
Contributor

openshift-ci bot commented Mar 7, 2026

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: hjensas

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@openshift-ci openshift-ci bot added the approved label Mar 7, 2026
@softwarefactory-project-zuul
Copy link
Copy Markdown

Build failed (check pipeline). Post recheck (without leading slash)
to rerun all jobs. Make sure the failure cause has been resolved before
you rerun jobs.

https://softwarefactory-project.io/zuul/t/rdoproject.org/buildset/405a150515cb4d04a24c973941b22c55

✔️ openstack-k8s-operators-content-provider SUCCESS in 1h 43m 57s
✔️ podified-multinode-ironic-deployment SUCCESS in 53m 08s
✔️ cifmw-pod-zuul-files SUCCESS in 4m 44s
hotstack-sno-2-bm FAILURE in 1h 25m 42s

@hjensas hjensas changed the title Add hotstack CI Job - sno-2-bm Add hotstack CI Job - sno-1-bm Mar 8, 2026
@softwarefactory-project-zuul
Copy link
Copy Markdown

Build failed (check pipeline). Post recheck (without leading slash)
to rerun all jobs. Make sure the failure cause has been resolved before
you rerun jobs.

https://softwarefactory-project.io/zuul/t/rdoproject.org/buildset/f36125e56e484fb8b70b4a23a444b106

✔️ openstack-k8s-operators-content-provider SUCCESS in 1h 42m 39s
✔️ podified-multinode-ironic-deployment SUCCESS in 53m 22s
✔️ cifmw-pod-zuul-files SUCCESS in 4m 36s
hotstack-sno-1-bm FAILURE in 1h 24m 21s

@hjensas
Copy link
Copy Markdown
Contributor Author

hjensas commented Mar 8, 2026

/test precommit-check

@hjensas
Copy link
Copy Markdown
Contributor Author

hjensas commented Mar 9, 2026

recheck

@softwarefactory-project-zuul
Copy link
Copy Markdown

Build failed (check pipeline). Post recheck (without leading slash)
to rerun all jobs. Make sure the failure cause has been resolved before
you rerun jobs.

https://softwarefactory-project.io/zuul/t/rdoproject.org/buildset/c061bd54801c45179645797e3239e3b6

✔️ openstack-k8s-operators-content-provider SUCCESS in 1h 11m 34s
✔️ podified-multinode-ironic-deployment SUCCESS in 54m 01s
✔️ cifmw-pod-zuul-files SUCCESS in 4m 27s
hotstack-sno-1-bm RETRY_LIMIT in 53m 35s

@hjensas
Copy link
Copy Markdown
Contributor Author

hjensas commented Mar 9, 2026

recheck

@softwarefactory-project-zuul
Copy link
Copy Markdown

Build failed (check pipeline). Post recheck (without leading slash)
to rerun all jobs. Make sure the failure cause has been resolved before
you rerun jobs.

https://softwarefactory-project.io/zuul/t/rdoproject.org/buildset/744cd9d429104e6cbe8748564ca32811

✔️ openstack-k8s-operators-content-provider SUCCESS in 1h 19m 18s
✔️ podified-multinode-ironic-deployment SUCCESS in 55m 12s
✔️ cifmw-pod-zuul-files SUCCESS in 5m 35s
hotstack-sno-1-bm FAILURE in 1h 01m 44s

@hjensas
Copy link
Copy Markdown
Contributor Author

hjensas commented Mar 10, 2026

recheck

2 similar comments
@hjensas
Copy link
Copy Markdown
Contributor Author

hjensas commented Mar 10, 2026

recheck

@hjensas
Copy link
Copy Markdown
Contributor Author

hjensas commented Mar 10, 2026

recheck

@hjensas
Copy link
Copy Markdown
Contributor Author

hjensas commented Mar 11, 2026

recheck

4 similar comments
@fserucas
Copy link
Copy Markdown

fserucas commented Mar 11, 2026

recheck

@hjensas
Copy link
Copy Markdown
Contributor Author

hjensas commented Mar 11, 2026

recheck

@nhicher
Copy link
Copy Markdown

nhicher commented Mar 11, 2026

recheck

@sf-project-io
Copy link
Copy Markdown

recheck

@softwarefactory-project-zuul
Copy link
Copy Markdown

Build failed (check pipeline). Post recheck (without leading slash)
to rerun all jobs. Make sure the failure cause has been resolved before
you rerun jobs.

https://softwarefactory-project.io/zuul/t/rdoproject.org/buildset/bf6f451926f0449bab21ccb2f934c71d

✔️ openstack-k8s-operators-content-provider SUCCESS in 1h 39m 16s
✔️ podified-multinode-ironic-deployment SUCCESS in 52m 10s
✔️ cifmw-pod-zuul-files SUCCESS in 4m 39s
hotstack-sno-2-bm FAILURE in 1h 20m 07s

@hjensas hjensas changed the title Add hotstack CI Job - sno-1-bm Add hotstack CI Job - sno-2-bm Mar 20, 2026
Single Node OpenShift (SNO), Sushy Emulator, 22 Ironic Nodes

Assisted-By: Claude (claude-4.5-sonnet)
Signed-off-by: Harald Jensås <hjensas@redhat.com>
@hjensas hjensas added the github-experimental Trigger github-experimental pipeline jobs label Mar 30, 2026
@softwarefactory-project-zuul
Copy link
Copy Markdown

Build failed (check pipeline). Post recheck (without leading slash)
to rerun all jobs. Make sure the failure cause has been resolved before
you rerun jobs.

https://softwarefactory-project.io/zuul/t/rdoproject.org/buildset/c4ced2cb428d4c6fa8c9d3901d88af18

✔️ openstack-k8s-operators-content-provider SUCCESS in 43m 51s
podified-multinode-ironic-deployment FAILURE in 25m 01s
✔️ cifmw-pod-zuul-files SUCCESS in 4m 17s

@hjensas
Copy link
Copy Markdown
Contributor Author

hjensas commented Mar 30, 2026

recheck

@hjensas hjensas added github-experimental Trigger github-experimental pipeline jobs and removed github-experimental Trigger github-experimental pipeline jobs labels Mar 30, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved github-experimental Trigger github-experimental pipeline jobs

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants